EXPERIENCED IN WORKING AT OIL AND GAS COMPLEX FACILITIES
LLP "EC "KAZGIPRONEFTETRANS"
IN THE LAST YEARS IN THE REPUBLIC OF KAZAKHSTAN

Oil well completion
Oil refining and ecological projects

Main oil pipelines
Main gas pipelines
Offshore terminals, liquefied gas bases, oil tank farms

Oil and gas field development, oil and gas collection, treatment and transportation

 

Name of facility

Client

Types of work

Year

Engineering data

1

Complex development of Ashikol, Sarykumak, Taskuduk- Western Taskuduk
of Sagiz block, located in Atyrau and Aktubinsk regions.

"Sagiz Petroleum" Company LLP

Comprehensive engineering surveys
Development of design and estimate and detail documentation
Design supervision

2014

Preparation and transportation of oil up to 505 th.t/y

2

Water reuse unit for TCO

"Tengizchevroil" LLP
General contractor - "IMTECH-BOLASHAK" LLP

Provision of personnel for adaptation of detail documentation to RK standards

2013

Capacity of water reuse device
5000 m3/day

3

TCO Future Growth Project

"Tengizchevroil" LLP
General contractor
"WorleyParsons Kazakhstan" LLP

Works for the TCO Sulfur Expansion Project

2010

Providing engineering assistance in developing designs for TCO

4

Kumkol Field Gas Recovery Project Modernization of the existing Gas Recovery Plant Building 4th and 5th Gas Turbine Units

"PetroKazakhstan Kumkol Resources" JSC

Development of design and estimate documentation, Integrated engineering surveys
Design supervision

2009

After upgrading the 5 gas-turbine power plants the total capacity will be 105 MW

5

Development of the Nuraly field during its pilot operation

"Kazgermunai" JV" LLP

Development of design and estimate documentation, Integrated engineering surveys
Design supervision

2007

Capacity: 3600 m3/day of oil
150 mln m3/year of gas

6

Akshabulak Field Produced Water Treatment Plant

"Kazgermunai" JV" LLP

Development of design and estimate documentation, Integrated engineering surveys
Design supervision

2007

Capacity
3600 m3/day

7

Expansion of the Akshabulak Field Gas Treatment Plant

"Kazgermunai" JV" LLP

Development of design and estimate documentation, Integrated engineering surveys
Design supervision

2007

Capacity 
310 mln m3/year

8

Gas collection, treatment, transportation and delivery facilities construction project at "KazakhTurkMunai" LLP fields, Saztobe, northeast of Saztobe

"KazakhTurkMunai" LLP

Development of design and estimate documentation, collection of initial data
Design supervision

2005

Pumping of 92 million n. m3 of associated gas, 22.0-km condensate pipeline, Pressure 10,0 MPa

 

 

 