WORK EXPERIENCE IN OIL AND GAS
COMPLEX FACILITIES OF «EC« KAZGIPRONEFTETRANS» LLP
FOR RECENT YEARS IN THE REPUBLIC OF KAZAKHSTAN
Expertise of Design and Estimate Documentation for Oil and Gas Facilities in the RoK

No.

Name of Facility

Client

Types of Work

Year

Engineering data

1

Inspection of the condition of Compressor Shops No.3, No.5 of CS "Opornaya", MGD "Atyrau", ITSA JSC.

KazMunaiEngineering Company

Experts Commission's Conclusion

2007

Turbo Compressor Shop No.3: - 20 ton capacity motor-operated traveling bridge; 3,2 ton capacity manual single-traveling crane
Turbo Compressor Shop No.5: - 10 ton capacity suspended motor-operated traveling bridge; 3,2 ton capacity manual single-beam traveling crane

2

Substantiation of Kazakhstan-China Gas Pipeline Construction-related investments

Gosekspertiza RSE

Experts Commission's Conclusion

2008

For C-1 option, pipe diameter: 1219mm+1016mm, for С-2, pipe diameter: 1422mm+1016mm, for С-3, pipe diameter: 2Х1067mm+1016mm. Turkmen gas transportation capacity: 300Х108m3 per year

3

Kazakhstan-China Gas Pipeline Construction

Gosekspertiza RSE

Design Process Section Appraisal

2008

Laying of the Pipeline from Uzbekistan border across Kazakhstan to Chinese border (Horgos) with a flow capacity of 30 billion m3 per year.

4

 Oil Loading Terminal in Kuryk village

Gosekspertiza RSE

Appraisal of Process Section FS

2008

Power production (up to 7,38 billion kW per hour), Power Station capacity: 1230 MW, fuel: gas and fuel oil, number of employees: 520.

5

Appraisal of Process Part of the Project "Kashagan Field Pilot Development Facilities Preparation. Offshore Complex Process facilities. А, D, ЕРС-2, ЕРС-3, ЕРС-4 Sections"

Gosekspertiza RSE

Project appraisal by the following sections: 
-           Process 
-           Instrumentation 
-           low current devices 
-  occupational safety, safety, fire safety, civil defense and emergency measures, anti-terrorist activities.

2009

Multi-phase fluid: 51 240 tons per day  
Gas production: 42,0 m3 per day 
Total number of islands: 897 thousand m2 
Total number of employees: 440 
Construction period: 36 months

6

Appraisal of Process Part of the Beineu-Shymkent Gas Pipeline Construction Project

Gosekspertiza RSE

FS Appraisal

2009

Pipe wall thickness: 10-16mm 
Pipe diameter: 1020mm 
Length of the Beineu-Samsonovka Gas Pipeline: 1487km Length of the branch running from the gas pipeline to Kereit: 22,5 km

7

 Appraisal of Process Part of the Shymkent Refinery Upgrading and Revamping Project

Gosekspertiza RSE

FS Appraisal

2009

Processing capacity: 6,6 million of crude oil per year. 
The output of light products will be 82% including 43 % of gasoline (2,57 million tons per year), 9% of kerosene (0,51 million tons per year); 
The oil refining efficiency will be 91%; 
The output of heavy products will be reduced from 32 % to 4,1% (0,76 million tons per year); 
Motor fuel quality parameters will reach those of Euro-4.

8

Filling Station Technical Assessment

Agip Caspian Sea B.V.Kazakhstan Branch

Technical Assessment Services

2011

Filling Station's Fixed Asset Technical Condition Analysis and Performance Assessment

9

Equipment and bulk material supply market investigation for Zhemchuzhina Project

Kaspi Meruerty Operating Company B.V. Company

Equipment and bulk material supply market investigation services

2011

Marketing research to identify potential equipment and bulk material suppliers to develop the Khazar field at the Caspian Sea water area. To supply equipment in accordance with the RoK law and international agreements on the free (duty free) transfer of goods between the Customs Union member states, which will result in reduced field development costs.


1